12.02.2021

Conversion of the return sludge control to sludge level measurement

structure-square

The secondary clarifiers at the Asselbrunn wastewater treatment plant in the Odenwald have been optimised. At the same time, the return sludge control was changed so that the delivery capacity of the pumps is now regulated according to the sludge level in the secondary clarifiers. This leads to a significantly more stable settling behaviour even with mixed water inflow, a considerably lower return sludge volume overall and at the same time a reduction in filterable substances in the inflow. Article published in KA-Betriebsinfo 10/2020, see downloads.

Further contributions

News from BITControl

Our new company brochure is here!
Three areas of expertise. One shared goal. Process engineering, specialist planning and software work together seamlessly at BITControl. This results in bespoke solutions for water, [...]
Lunch together by the lake and in the garden
In April, we were treated to a very special lunch: the Maximinschule – a special school for learning and language – [...]
BITControl is a FlowChief partner
BITControl FlowChief has been a Silver Certified Partner since February 2026. Service is the be-all and end-all. Service is our top priority [...]