Replacement of the aerators at the Au wastewater treatment plant

The best aerators and blowers and the best control tools are useless if the control system is not set correctly. At the Au wastewater treatment plant of the Hamm/Sieg municipality, the aeration technology with the blowers and the EMSR was completely replaced in 2024. Since then, the aeration has been running with the controller's initial settings. After the plant manager, Mr Rabbich, informed us that he was not satisfied with the nitrogen elimination, we looked at the controller settings and made adjustments.

Adjustment of the control parameters

The adjustment of the control parameters means that the aerated and non-aerated phases are now much more clearly delineated. The oxygen setpoint is reached more quickly in the aerated phase. This shortens the aerated phase and leaves more time for denitrification. As a result, both nitrification and denitrification are improved.

At the same time, you can see that the ventilation times are shorter, so the energy consumption of the fans is also reduced.

Regular checks

The control behaviour in the biological stage should be checked regularly. Adjusting the control parameters may take a few hours of work. The change in the settings must be observed and evaluated again and again over a period of several weeks. However, no installation or programming is required. The energy savings and the improvement in the discharge values result in a high added value of such a measure in a short time.

Norbert Meyer, June 2025

Further contributions

News from BITControl

Fine adjustment of the aeration control: more nitrogen elimination, less energy consumption
Replacing the aerators at the wastewater treatment plant Au The best aerators and blowers and the best control tools are useless if the [...]
We are hiring: IT Specialist Application Development (m/f/d)
BITControl develops intelligent software solutions for water and wastewater technology as well as for biogas plants. Its particular strength lies in the combination of [...]
Electrical engineering planner wanted
We are hiring: Electrical technician / electrical engineer / master electrician (m/f/d) with professional experience. BITControl is a specialist planner for electrical, mechanical and process engineering for wastewater treatment [...]