30.04.2019

Optimisation of the sludge cycle

structure-square

Improving the purification performance of the Zahmen wastewater treatment plant

Since its construction, the Zahmen wastewater treatment plant in the municipality of Grebenhain has had problems with the function of the secondary clarifier. Here, the sludge level rose significantly to critical levels when the mixed water inflow began and continued.

The wastewater treatment plant was analysed, recalculated and evaluated by BITControl. The following measures were implemented to improve the treatment performance:

  • A new, larger inlet cylinder with inlet pipe was installed in the secondary clarifier
  • A partition wall was installed in the RLS shaft in order to be able to control the two secondary clarifiers separately. A bypass pipe was also installed to improve the operating point of the pumps.
  • At the same time, parts of the EI&C technology were renewed or supplemented: switchgear, sludge level measurement, automation technology
    The return sludge control was converted to sludge level control.
Further contributions

News from BITControl

Company holidays, Christmas greetings
Company holidays We will be closed for the holidays from Monday, 22 December 2025 through 2 January 2026. In the new year, we will be open from [...]
AQUA DESIGNER - Dimensioning of wastewater treatment plants
Dimensioning software - almost 30 years of programmed experience 29 years ago, we launched AQUA DESIGNER, the software for planning [...]
Pumping, hiking, AI and good food
BITControl company outing on 12 and 13 September 2025 This year's two-day company outing took us to the Bonn/Königswinter region and offered a [...]