BITControl is planning two SBR plants (6,000 and 36,000 PE) for the Lagos State Wastewater Management Office. The planning is accompanied by an 8-week training programme for two engineers from Nigeria in our office in Nattenheim.

BITControl is planning two SBR plants for 6,000 and 36,000 PE for the Lagos State Wastewater Management Office. As we only have dry weather plants with a defined volume of wastewater, the plants are being designed as sequencing batch activated sludge systems (SBR). Carbon and nitrogen elimination with simultaneous aerobic sludge stabilisation Stabilisation required.
In these systems, energy efficiency is one of the most important capabilities, taking into account the necessary elimination requirements. For example, membrane aeration with highly efficient aerators
aerator and supplemented by a highly developed measurement, control and automation concept.
Concept.
The implementation of the system is accompanied by intensive training for the engineers at LSWMO. Thanks to the implemented SCADA, BITControl is able to support the operators in process and maintenance issues at all times.
Everyone involved in the project is aware that proper operation of the systems is not only a question of good planning and construction, but also of good maintenance and monitoring during the operating phase.
The planning was carried out by AQUA DESIGNER and adapted to the local conditions.
Translated with DeepL.com (free version)