BITControl provided planning support for the process engineering and energy modernisation and optimisation of the Asselbrunn wastewater treatment plant in the Odenwald. The key points were
- Optimisation of process engineering and load management in terms of energy efficiency
- Installation of EI&C technology for recording, visualising and monitoring the operation of machines, process stages and the entire plant
- Integration of a 250 kW PV system into the system supply
- Establishment of load management and modernisation of CHP 50kW and CHP 108 kW with the aim of minimising electricity consumption
- Integration of a gas pipeline to supply a CHP unit